Date of Request:
March 2001 Date Posted: May 5,
2001 Update: June 11, 2001 CIC Reference No. 113 Data Providers: Mitchell International, ADP Claims
Solutions Group, Motor Information Services/CCC Information Systems
Original Time Allowance: 0.4 (Mitchell and
Motor) Original Labor Note: Includes
time to drill holes (Mitchell only)
Issue: Time allowance is not realistic for
drill time: Documented steps involved with this operation.
- Removing the five attaching nuts.
- Remove the wire harness (third tail lamp) from spoiler to deck
lid.
- Fabricate template for 8 mounting holes that are three
different size and configurations.
- Two outer oval holes for the spoiler alignment studs.
- Two outer 5mm bolt holes
- Two outer 10mm bolt holes
- One center 10 mm bolt hole
- One center oval wire harness hole to accommodate harness
grommet.
- Drill 8 holes that are three different size and configuration.
- Replace E-coat and rustproof drilled area.
- Vacuum metal shavings produced by the drilling/filing process
- Clean and retape adhesive sealer at center section or spoiler.
- Install and align spoiler.
As the average technician can visualize, this is not just
drilling 8 holes. There are three different size and shapes of holes for this
operation along with the complexity of fabricating a template. If the template
is not properly fabricated the spoiler will not align properly. The industry
respectfully requests a change in the allowed time that realistically reflects
what needs to be done.
Response:
- Motor/CCC Allows 0.4, but time does not include
"drill time." Drilling is a non-included operation.
- ADP Drilling is not included in the
operations nor is the wiring harness or restoration of E-Coat. ADP provides
Exlusions of Labor in the ADP Reference manual on pages 50-52.
- Mitchell Increased labor
allowance 0.2hrs. Application of anti-corrosion rust resistant materials, clean
vehicle to pre-accident condition and clean and retape of adhesive are not
included operations.
Results/Change:
| Mitchell |
June 11, 2001 |
Increased labor allowance
0.2hrs. Application of anti-corrosion rust resistant materials, clean vehicle
to pre-accident condition and clean and retape of adhesive are not included
operations. |
| Motor |
March 2001 |
Adding drill time makes the time allowance
realistic |
| ADP |
March 15, 2001 |
Drilling is not included in the operations nor is the wiring
harness or restoration of E-Coat. ADP provides Exlusions of Labor in the ADP
Reference manual on pages 50-52. |