CIC Data Base Inquiry
Reference No. 149
2000-02 Nissan Sentra, Sedan 
R&R or R&I Deck Lid Hinge

 

Date of Request: September 9, 2002
Original Date Posted: September 25, 2002

Data Providers:
MOTOR Information Services, Mitchell International, ADP Claims Solutions Group, CCC Information Systems

Issue:

 

1.      However, in order to R&I package trim, the rear seat (upper and lower) need to be removed, the seat belts need to be R&I as well as all interior trim, left, right, upper and lower.

Suggestion:

To all providers, please review the operation:

 

1. List actual time for entire operation.

2. Or, state in "labor note" all the items that must be removed to facilitate entire operation.

 

Results:

Mitchell

 

Original Time Allowance

.3 hrs

Labor Note: With luggage lid, rear seat & parcel shelf trim removed.

 

Response:

September 27, 2002

The complexity involved in overlap identification prevents an all-inclusive allowance. However, we added additional clarification to the labor note stating all items that require removal in order to replace the Luggage Lid Hinge.

 

 

CCC

 

Original Time Allowance

.3 hrs

Labor Note: After package tray removed.

 

Response:

See Motor

 

 

MOTOR

 

Original Time Allowance

1.0 hrs

Labor Note: None

 

Response:

October 14, 2002

Changed labor time on trunk lid hinges to 0.3 hours w/footnote "Time is after trunk lid, package tray and all necessary trim are removed."

 

 

ADP

 

Original Time Allowance

1.4 hrs

Labor Note: 

  1.7 hrs Also Included

 

Response:

October 19, 2002

The Actual time for the R&I of one Deck Lid Hinge is 1.4 and 1.7 if both are selected. This time does include the removal of the Package Tray Trim Panel and the Rear Seat Assembly. According to the manufacturer's current service information, the removal of the rear seat belts and trims are to be done after the removal of the rear seat. Therefore, those operations will not be considered in the R&I time of the Hinges. The operations considered for the R&I of these hinges can be viewed through the Labor Report.

 

   Back to DB Inquiries List      Estimating Committee Page